SUNY Maritime College Annual Report 2021-2022

SMV): 2021-2022 College. Construction began in 2020 and continues through 2022. The state-of-the-art multi-mission train the next generation of merchant mariners.

Photos: Arpi Pap, Philly Shipyard, RADM Alfultis

APRIL 2022

JUNE 2022

Construction of the Empire State VII continues at the grand block in Philly Shipyard. The hull and superstructure will be completed by summer.

The bow (forward part of the ship) awaits installation on the dry dock. The ship’s hull (most notable structural entity and watertight body of a ship) will be completed in August and launching of the ship will take place in September 2022.

Annual Report 2021-2022 9

Made with FlippingBook Ebook Creator